|
BORUSAN Güç Sistemleri San. ve Tic. A.Ş.- İstanbul
-
Philip Morris – İzmir, 4*2250 kW Stand-by Generator Fuel System
Design, Manufacturing and Erection,
1998
-
Soda Sanayi - Mersin, 3.5 MW Generator Fuel, Waste Gas, Cooling
System Design, Manufacturing and Erection,
1998
-
Tanrıverdi Tekstil - Çorlu, 4 pcs. 3516 Gas Engines
and
Heat Recovery System Packing Project,
2003
-
Aktin Tekstil - Çorlu, 1 pc. 3520 Gas
Engine and Heat Recovery System Packing Project, 2003
-
Saray Örme - Bursa, 3 pcs. 3516 Gas Engines
and
Heat Recovery System Packing Project,
2003
-
Çelik Halat - İzmit, 2 pcs. 3516B Gas Engines
and Heat Recovery System Packing Project,
2003
-
Nuryıldız Tekstil - İstanbul, Waste Heat Recovery Boiler
Modification, 2003
-
Baydemirler - İstanbul 3 pcs 3520C Gas
Engines and Heat Recovery System Packing Project, 2004
-
Akman Tekstil -
Çorlu 1 pc. 3520 Gas Engines
and Heat Recovery System Packing Project, 2004
-
Mercedes Benz - İstanbul, 4 pcs 3520 Gas Engines
and Heat Recovery System Packing,
Complete Erection, 2004
-
Botaş Nehir Tekstil - Çorlu, 3516B
Heat Recovery System Manufacturing and Commissioning,
2004
-
Süperboy - İstanbul, 1 pc 3516 Gas
Engines and Heat Recovery System Packing Project, 2004
|